
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
Archive Projects
Listed below are more examples of projects we have been involved with over the past few years, should you require a case study regarding a specific project please feel free to contact us.
The downloadable files are in PDF format, should you have problems in downloading or viewing them please go to the following link.
The page will open in a separate window.
![]() |
Land & Water Services Ltd. win awards for the regeneration of two sites which utilise the knowledge and expertise of ACE for the provision of two bespoke stainless steel water control structures. |
|
![]() |
Due to theft and damage caused to the original cast iron flap valves, ACE were invited to the site to offer advise and expertise on the use of HDPE flap valves and inline non-return valves for the unique requirements at Kellingley Crook Pumping Station. |
|
![]() |
ACE work alongside the main contractor and consultants to develop large flap valves designed to protect the river Erewash from being flooded by the river Trent near Nottingham. In addition a bespoke fish pass flap was designed by ACE to allow the passage of fish through the structure. |
|
![]() |
The 6525 was supplied to the Environment Agency in Cambridgeshire Berkenheger boats are known for their quality but the 6525 took this to a new level due to changes at Berkenheger these boats now offer a superior finish along with all the previous qualities of : | |
![]() |
As part of a continuing programme of water level structure improvements in Somerset, ACE have recently been heavily involved in the design and manufacture of two large tilting weirs for the Greylake structure improvements. |