ACE protect Carrs Biscuit factory from flooding
Following the aftermath of the 5 day storm Desmond in 2015, pladis global were brought in to protect Carrs Biscuit Factory in Carlisle. The design of the flood defences was undertaken by Cluttons LLP and ACE supplied and delivered 38 WaStop® non-return valves, 9 actuator controlled ACE penstocks and a local control package to work in tandem with the penstocks.
“The installation and commissioning of the penstock and WaStop® valves was carried out in a professional manner by ACE with any problems arising being dealt with promptly. On behalf of pladis I would like to thank ACE for their contribution to the flood defence scheme.” – Nazim Gire, Project Lead Director.