2013
Morpeth Flood Alleviation Scheme project
Morpeth Flood Alleviation Scheme was ACE’s first full M&E turnkey project. This included five 3x3m penstocks, supply and install of the hydraulics’, HPU’s and the control systems.
Morpeth Flood Alleviation Scheme was ACE’s first full M&E turnkey project. This included five 3x3m penstocks, supply and install of the hydraulics’, HPU’s and the control systems.